Products
TempoSync-4000
Typical order model: TempoSync-4000-GN-O-S Coming soon
Gigabit flagship path for plant/rack half-width use: multi-port and higher capacity, optional OCXO, PTP as optional capability.
Fit Fit: plant / half-rack rooms needing multi-port or higher-capacity paths (roadmap selection).
Not for Not for: immediate shipping cabinet contracts (cover with TempoSync-3000 first).
Flagship SKU (in development). Upgrades ports, capacity, and form factor vs 3000. Specs below are planned directions—not final commitments until the shipping datasheet is published.
How it differs from the other model
vs TempoSync-3000: 4000 targets multi-port and half-rack form—do not tender against unpublished items.
TempoSync-3000 · How to choose
Specification summary
| Role | Value flagship for China market; upgrade SKU above TempoSync-3000 |
|---|---|
| Form factor direction | Half-width 1U / rackable; multiple physical ports (mgmt/timing separable) |
| Constellation (order code GN) | Multi-constellation GNSS (module-dependent; BeiDou emphasized) |
| Oscillator options | T=TCXO / O=OCXO; power S/D |
| Timing direction | NTP-first; PTP (default E2E/P2P) as optional SKU/license—not full-profile day one |
| Management direction | Cabinet Web + SNMP; HTTPS / SNMPv3 as contract options |
| Capacity direction | Hundreds of LAN clients class (no inflated throughput marketing) |
Interfaces
- Multi Ethernet (planned)
- Timing I/O (PPS / IRIG, planned)
- GNSS antenna
- Optional front status display
Included
- Planned: GNSS-disciplined NTP Stratum 1
- Planned: ≥2 independent ports and gigabit path
- Planned: 1PPS / IRIG-B timing I/O retained and strengthened
- Planned: Chinese Web / panel localization
Not included (do not assume for tenders)
- No day-one full PTP profile / license maze selling model
- Not chasing modular carrier-core high-end platforms on price
- Until the shipping datasheet is published, throughput/ns Ethernet claims are not contractual
The TempoSync-4000 shipping datasheet is not published yet. The table above is directional planning only—contract against the formal datasheet when available.