TemporaSync™
SY-8640
NTP Time Server · Stratum 1
Typical order model: SY-8640-GN-O-S Roadmap
Nameplate: TemporaSync · SY-8640
For power and metals plants and half-rack rooms: multi-gigabit ports with separable management and timing, optional OCXO, NTP-first with PTP as a planned option.
Fit Power/metals plants, SIS companion, separated mgmt/timing or half-rack form (roadmap); bridge with 1231/4096.
Not for Immediate cabinet delivery contracts (use SY-1231; half-width 1U stamp + hardware time I/O → 4096).
Flagship path (in development). vs 4096: multi-port, half-rack, hundreds-of-clients class for plant half-rack and multi-port tenders. Planned direction only until the shipping datasheet.
How it differs from the other model
8640 is 86400 s/day without the trailing zero (24×360)—flagship time-origin name. Do not tender unpublished items. Below: SY-1231 protocol, SY-4096 cabinet capacity. Reserved next: SY-16384.
TemporaSync SY-1231 · TemporaSync SY-4096 · How to choose
Specification summary
| Role | Multi-port / half-rack flagship path; form-factor and port upgrade vs SY-4096 |
|---|---|
| Form factor direction | Half-width 1U / rackable; multiple physical ports (mgmt/timing separable) |
| Constellation (order code GN) | Multi-constellation GNSS (module-dependent; BeiDou emphasized) |
| Oscillator options | T=TCXO / O=OCXO; power S/D |
| Timing direction | NTP-first; PTP and related options are planned/contractual paths—follow the shipping datasheet |
| Management direction | Cabinet Web + SNMP; HTTPS / SNMPv3 as contract options |
| Capacity direction | Hundreds of LAN clients class (no inflated throughput marketing) |
Interfaces
- Multi Ethernet (planned)
- Timing I/O (PPS / IRIG, planned)
- GNSS antenna
- Optional front status display
Included
- Planned: GNSS-disciplined NTP Stratum 1
- Planned: ≥2 independent ports and gigabit path
- Planned: 1PPS / IRIG-B timing I/O retained and strengthened
- Planned: Chinese Web / panel localization
Not included (do not assume for tenders)
- No day-one full PTP profile license pack
- Not positioned as a carrier-core modular platform
- Until the shipping datasheet is published, throughput/ns Ethernet claims are not contractual
The TemporaSync SY-8640 shipping datasheet is not published yet. The table above is directional planning only—do not publish unmeasured req/s; contract against the formal datasheet when available.
FAQ
- Can we tender SY-8640 against a shipping datasheet?
- No. The shipping datasheet is not published yet. Page content is directional planning only—contract against the formal datasheet when available. Bridge with SY-1231 or 4096.
- When should we wait for the 8640?
- Power/metals plants that need separated management and timing ports, multi-gigabit links, dual supply, or higher capacity. Single-subnet cabinet NTP → 1231; single-port stamp+OCXO+IRIG → coming 4096.
- May we put PTP or unpublished throughput into an RFQ?
- No. The line is NTP-first; PTP is a planned/contractual option. Until the shipping datasheet, throughput or nanosecond Ethernet figures are not contractual.